Type 1 IBAA (Incinerator Bottom Ash Aggregate): a recycled sub-base that must be sealed under asphalt, concrete or another low-permeability surface.
IBAA is a recycled aggregate produced by processing the ash left after energy-from-waste incineration. Graded as a Type 1 sub-base, it provides a compactable foundation for road, cycleway and footpath sub-bases, structural platforms and pipe bedding, and reduces demand for quarried stone. In England it is classed as a waste, and its use without an environmental permit is governed by conditions set by the Environment Agency, summarised below.
- Grading
- Type 1 sub-base
- Material
- Incinerator Bottom Ash Aggregate (recycled)
- Best for
- Sub-base under asphalt or concrete, structural platforms, pipe bedding
- Note
- Must be covered by a low-permeability surface such as asphalt or concrete
Conditions of use
Summary of the Environment Agency's regulatory position statement RPS 325 (England), which allows IBAA to be used without an environmental permit only when all of its conditions are met:
- Use only as a road, cycleway or footpath sub-base, a structural platform or pipe bedding.
- Road and path sub-bases must be surfaced with asphalt or another low-permeability material; structural platforms must be at least 95% covered by a low-permeability surface or building; pipe runs need a low-permeability surface above them, laid to falls so water cannot stand.
- Not beneath any residential building or garden, below the water table, or in a groundwater source protection zone 1 or 2.
- Not within 50 metres of a spring, well or water-supply borehole, and structural platforms not within 25 metres of a surface water body.
- Size limits apply: sub-bases up to 40 metres wide and 0.7 metres deep; structural platforms up to 1 metre thick on average and 25,000 tonnes in total, less near watercourses; pipe bedding up to 510 tonnes per project.
- Do not store it on site for more than 6 months.
- Keep the delivery records we supply with each load for 2 years and make them available to the Environment Agency on request.
If your project cannot meet these conditions, an environmental permit is needed. Always check the current statement before use. Read RPS 325 on GOV.UK
Loose bulk delivery & bulk bags
Ask for a loose bulk quote for larger quantities, or discuss bulk bags for your project. Supply format, availability and delivery arrangements are confirmed when quoting.
Choosing your quantity
Tell us the application, site location, area and depth, and what surface will be laid over it, so we can confirm the use fits the conditions above before supply.
Our tonnage calculator uses length, width and depth with a typical bulk density. The result is a planning estimate; confirm your final quantity with us, especially where compaction or a lightweight material affects the calculation.
Delivery across Doncaster and beyond
Falgate supplies aggregates across Doncaster, Goole, Scunthorpe, Sheffield, Leeds and surrounding areas from Dunscroft. Send your postcode, required quantity and preferred date for a delivery quote.
Tell us about the entrance width, unloading area, overhead obstructions and any access restrictions. If you need material placed beyond the unloading point, discuss grab hire with us.
Call 07450 701529, Monday–Friday 08:00–17:00.